Temperature checks are no more at @UniversalORL. We are here to see other changes and hopefully catch a #Velocicoaster soft opening
The social distancing markings are now set up for 3 feet. Universal is using smaller versions of the original ground marking designs. – bei Universal CityWalk
We are waiting to get into Islands of Adventure, read up on the new changes while we wait. https://twitter.com/attractions/status/1390088350137212931">https://twitter.com/attractio...
We have begun our steady march into the park. – bei Universal CityWalk
The Incredible Hulk is once again doing Single Rider and filling the coaster trains to 100% capacity. – bei The Incredible Hulk Coaster
The renovated #Velocicoaster bridge bypass is not open right now. Guests will have to go through Hogsmeade or Toon Lagoon to get to Jurassic Park.
The #Velocicoaster is running empty vehicles, but the entrance is blocked off. “Opening June 10th” says Team Members.
If #VelociCoaster does soft open today, it’s going to be a while. Currently the vehicles are being sent around loaded with weighted dummies. – bei Jurassic Park
Grab your hot #butterbeer soon! The summer months are close and the warm version will be going away temporarily.
Here is your proof. All @UniversalORL ride vehicles with individual seating or individual restraints are filling to 100 percent capacity. ( @TharinWhite says hi!)
Don’t like reading? No problem, click the link below for a video version of the info in this thread.
https://youtu.be/kMWVtWLrjdA ">https://youtu.be/kMWVtWLrj...
https://youtu.be/kMWVtWLrjdA ">https://youtu.be/kMWVtWLrj...