
#FerrovialGSM2021
For the second consecutive year, we are holding the General Shareholders' Meeting virtually. Due to the COVID-19 pandemic, we believe that it is the safest and most responsible choice.
Our Chairman, Rafael del Pino, Chairman of Ferrovial, is discussing Ferrovial’s results at the #FerrovialGSM2020. Follow along live here: https://ferrovial.jga.events
Rafael del Pino highlights the financial health of the company with a record level of liquidity of 7.96 billion euros and a net cash position of 1.99 billion euros, excluding infrastructure projects. https://ferrovi.al/yhr0hgg8nd/
Some of the main contracts obtained in 2020:
participation in the design and construction of the HS2 high-speed railway line in the UK
the reconstruction of highway SL12 in Texas
the reconstruction of Warszawa-Zachodnia railway station in Poland



Del Pino emphasized the resilience of the company's assets, which distributed 458 million euro in dividends despite the current health crisis.
. @IMadridejos, CEO of Ferrovial, takes the floor at #FerrovialGSM2021. Listen to his remarks live via the following link: https://ferrovial.jga.events
We review how COVID-19 has impacted our activity and what steps we have taken to combat the pandemic. In addition to protecting the health of our employees, we launched the #FerrovialTogetherCOVID19 fund in 2020. https://ferrovi.al/ceuhhj5eql/
. @IMadridejos explains the progress after the first year of the Horizon 24 Plan at #FerrovialGSM2021. This strategy for the 2020-2024 period places the company's focus on the promotion, construction and management of sustainable infrastructure. https://ferrovi.al/el7x77hz84/
“The strategy is being pursued with a focus on conserving liquidity and driving efficiency, while also assessing growth opportunities.” - @IMadridejos
He emphasizes Ferrovial's commitment to sustainability and climate change, which are key components of the company's strategy, in terms of both reducing the emissions from the company's own activities and of presenting solutions for mobility and more sustainable infrastructure.
. @IMadridejos highlights the 37 projects of the Next Generation Plan that represent an investment of €5 billion that cover aspects such as urban rehabilitation, transformation of industrial estates, production of renewable energy from waste, and urban mobility.
The #FerrovialGSM2021 concludes with the approval of all the agreed-upon points. Thanks for following along. Take a look at the rest of the information here
https://ferrovi.al/0fo37y0wt7/
