This afternoon, we inspected the ongoing construction of Sections 1 and 2 of the 12.5km dualization of Challenge-Odo Ona Elewe-Apata Road in Ibadan. The construction is being carried out by Kopek Construction Nigeria Limited.
When the road is completed, it will significantly reduce traffic along the Challenge-Apata axis in Ibadan.