Since May & #JulyStimulus (29th) “re-imagining” Cork announcement we’ve seen a very slow drip of parking despite considered as "quick wins".
u2028
https://abs.twimg.com/emoji/v2/... draggable="false" alt="👍" title="Thumbs up" aria-label="Emoji: Thumbs up"> 43 stands have been promised.
https://abs.twimg.com/emoji/v2/... draggable="false" alt="👎" title="Thumbs down" aria-label="Emoji: Thumbs down"> 8 new locations have been delivered.
@CorkCyclingCrew
1/10
Since May & #JulyStimulus (29th) “re-imagining” Cork announcement we’ve seen a very slow drip of parking despite considered as "quick wins".
u2028
@CorkCyclingCrew
1/10
There has been an attempt to include some existing stands eg. Fitzgerald Park and Blackrock Castle Car Park by @corkcitycouncil in press releases.
https://www.irishexaminer.com/news/arid-40066917.html">https://www.irishexaminer.com/news/arid...
I did a breakdown of new locations and the no. of parking provided - unbranded vs branded in 2020.
2/10
https://www.irishexaminer.com/news/arid-40066917.html">https://www.irishexaminer.com/news/arid...
I did a breakdown of new locations and the no. of parking provided - unbranded vs branded in 2020.
2/10
New locations - Unbranded:
- Corner of Princes St w/ Sth Mall (6)
- North Main St Shopping (8)
- North Main St (4)u2028
- Daunt Square (6)
u2028- Coburg Street (6)
Total bike spaces: 30
No. of car spaces repurposed: 0
3/10
- Corner of Princes St w/ Sth Mall (6)
- North Main St Shopping (8)
- North Main St (4)u2028
- Daunt Square (6)
u2028- Coburg Street (6)
Total bike spaces: 30
No. of car spaces repurposed: 0
3/10
New locations - Branded:
- St Patrick’s Street (opposite Merchants Quay) (8)
- Union Quay (8)
- Parnell Place (8)
- Ballincollig Regional Park (8)
Total bike spaces: 32
No. of car spaces repurposed: 0
4/10
- St Patrick’s Street (opposite Merchants Quay) (8)
- Union Quay (8)
- Parnell Place (8)
- Ballincollig Regional Park (8)
Total bike spaces: 32
No. of car spaces repurposed: 0
4/10
If we include existing branded stands installed in 2019:
- Fitzgerald Park (8)
- Blackrock Castle Car Park (8)
Total bike spaces: 16
No. of car spaces repurposed: 0
5/10
- Fitzgerald Park (8)
- Blackrock Castle Car Park (8)
Total bike spaces: 16
No. of car spaces repurposed: 0
5/10
So far in 2020, there has been an increase of ~62 spaces at 8 locations. ~16 spaces in 2019
To bring the no. of spaces to the number of "near 500" pushed by CCC, see article in this thread, the remaining 25-30 stands promised by end of the yr need to provide ~422 spaces.
6/10
To bring the no. of spaces to the number of "near 500" pushed by CCC, see article in this thread, the remaining 25-30 stands promised by end of the yr need to provide ~422 spaces.
6/10
From an FOI request:
https://abs.twimg.com/emoji/v2/... draggable="false" alt="📅" title="Kalender" aria-label="Emoji: Kalender"> Phase 1 tender went out on July 29th at a cost of €17,030. No. of stands not given.
https://abs.twimg.com/emoji/v2/... draggable="false" alt="📅" title="Kalender" aria-label="Emoji: Kalender"> Phase 2 tender result was denied in my FOI as it had yet to be awarded. Put to tender on the 8th of Sep.
41 days after the "re-imagining" Cork announcement...
7/10
41 days after the "re-imagining" Cork announcement...
7/10
8/10
My FOI request also asked for any "consultations" with "external groups/businesses/property owners" and CCC.
This was unfortunately refused on grounds that it doesn& #39;t exist as it has been taken to be a literal consultation instead of engagement with groups/businesses etc.
9/10
This was unfortunately refused on grounds that it doesn& #39;t exist as it has been taken to be a literal consultation instead of engagement with groups/businesses etc.
9/10
Overall, @corkcitycouncil are VERY far behind on delivering promised cycling infrastructure that was promised in #JulyStimulus let alone outside of this.
FOI request on all correspondence with the NTA also incoming so that may shed more light or info so stay tuned...
https://abs.twimg.com/emoji/v2/... draggable="false" alt="👀" title="Augen" aria-label="Emoji: Augen">
10/10
FOI request on all correspondence with the NTA also incoming so that may shed more light or info so stay tuned...
10/10