earlier this year adelaide-based nuclear lobby group @BNW_Aus submitted this chart (sans emoji) to the #victorian parliamentary inquiry into #nuclear prohibition.
one problem: itâs


. @BNW_Aus claims to be an environment group, yet *all* they seem to do is fight against australiaâs nuclear bans.
iâve no problem with nuclear advocacy â nuclear technology is pretty amazing & we should keep our minds open â but why not just be honest & admit your sole purpose?
iâve no problem with nuclear advocacy â nuclear technology is pretty amazing & we should keep our minds open â but why not just be honest & admit your sole purpose?
the chart aims to show that nuclear is awesome because itâs just so thrifty.
BNW's GM @dayne_eckermann says itâs relevant because âyou need materials mined from the ground to make things. it's better if we limit that as much as possible to protect the environmentâ.
fair enough.
BNW's GM @dayne_eckermann says itâs relevant because âyou need materials mined from the ground to make things. it's better if we limit that as much as possible to protect the environmentâ.
fair enough.
. @BNW_Aus's chart claims you need ~7,200t of steel & iron and ~3,700t of concrete & cement to produce one terawatt hour of electricity from solar PV.
holy crap⌠thatâs a scary amount of stuff!
*but* it's wrong. very wrong.
(side note: who sums concrete & cement volumes?)
holy crap⌠thatâs a scary amount of stuff!
*but* it's wrong. very wrong.
(side note: who sums concrete & cement volumes?)
while the material input for a solar farm naturally varies with construction techniques & local conditions, @BNW_Aus's number does look awfully high.
âŚso i did what BNW never bothered to doâŚÂ
i asked a solar developer.
âŚso i did what BNW never bothered to doâŚÂ
i asked a solar developer.
construction will soon start on the 5MW kentucky solar farm in nrthrn NSW.
KSF will use fixed-tilt east-west panels, âPEGÂŽ framing systemâ & integrated central inverter/transformers.
âŚand just 2.8mÂł of concrete â for the fence post end-assemblies!
itâll look a bit like this:
KSF will use fixed-tilt east-west panels, âPEGÂŽ framing systemâ & integrated central inverter/transformers.
âŚand just 2.8mÂł of concrete â for the fence post end-assemblies!
itâll look a bit like this:
comparing @BNW_Aus estimates with KSF, you can see that BNW *massively* overstates the materials required for this modern solar farm:
â˘Â copper: 25x overstated
â˘Â glass: 2.6x
â˘Â steel & iron: 17x
â˘Â concrete & cement: 218x!
hoo boy, how embarrassing!
â˘Â copper: 25x overstated
â˘Â glass: 2.6x
â˘Â steel & iron: 17x
â˘Â concrete & cement: 218x!
hoo boy, how embarrassing!
if we reformat the data so that it is directly comparable to the BNW submission, we see that the âtotal material useâ for this solar case study turns out to be very similar to their value for #nuclear:
(stacking material quantities⌠what a weird thing to doâŚ)
(stacking material quantities⌠what a weird thing to doâŚ)
so how did @BNW_Aus get it __so__ wrong?
they grabbed their numbers from the â2015 Quadrennial Technology Review, published by the US depât of @energy.
https://www.energy.gov/quadrennial-technology-review-0
but where did that study get its numbers?
they grabbed their numbers from the â2015 Quadrennial Technology Review, published by the US depât of @energy.
https://www.energy.gov/quadrennial-technology-review-0
but where did that study get its numbers?
the QTR grabbed the figures from the 2014 Greenhouse gases, Regulated Emissions, and Energy use in Technologies Model (GREET), developed by the @argonne national laboratory.
https://greet.es.anl.gov/
but where did that paper source its numbers?
https://greet.es.anl.gov/
but where did that paper source its numbers?
GREET pulled its numbers from a 2010 paper, also from @argonne called ââLife-Cycle Analysis Results of Geothermal Systems in Comparison to Other Power Systemsâ.
âŚwhich in turn drew from 4 *ancient* papers:
https://greet.es.anl.gov/publication-geothermal_and_other_power
âŚwhich in turn drew from 4 *ancient* papers:
https://greet.es.anl.gov/publication-geothermal_and_other_power
that 2010 paper took a simple average of the 4 papers, without *any* analysis.
one of those papers, pacca and horvath (2002), is a clear outlier, dragging the average towards crazy town!
13,343t/TWh vs KSF's 17.
out by 3 orders of magnitude! https://www.scribd.com/document/480924992/Greenhouse-Gas-Emissions-from-Building-and-Operating-Electric-Power-Plants-in-the-Upper-Colorado-River-Basin
one of those papers, pacca and horvath (2002), is a clear outlier, dragging the average towards crazy town!
13,343t/TWh vs KSF's 17.
out by 3 orders of magnitude! https://www.scribd.com/document/480924992/Greenhouse-Gas-Emissions-from-Building-and-Operating-Electric-Power-Plants-in-the-Upper-Colorado-River-Basin
âŚbut let's cut pacca and horvath some slack!
back in 2002 _nobody_ had ever built a large solar PV project⌠the global industry was 1/1000th its size today.
this is so quaint! they were imagining putting concentrating lenses over the 100W panelsâŚ
back in 2002 _nobody_ had ever built a large solar PV project⌠the global industry was 1/1000th its size today.
this is so quaint! they were imagining putting concentrating lenses over the 100W panelsâŚ
aha! that explains how @BNW_Aus got it so wrong.
their analysis drew heavily on 2002 musings about a solar sector that could only be imagined.
6-7 major innovation cycles have since transpired.
âŚso where did BNWs #nuclear numbers come from?
(i bet they didn't even know.)
their analysis drew heavily on 2002 musings about a solar sector that could only be imagined.
6-7 major innovation cycles have since transpired.
âŚso where did BNWs #nuclear numbers come from?
(i bet they didn't even know.)
. @BNW_Aus's #nuclear numbers are ultimately sourced from a 1974 oak ridge technical report based on a 1971 reference design.
https://www.osti.gov/biblio/4284838
https://www.osti.gov/biblio/4284838
the design predates three mile island, chernobyl, 9/11 & fukushima â each of which impacted our understanding of nuclear safety, and collectively had significant impacts on plant design.
even in 1974 the authors highlighted that the design was not to then current standards!

the introduction of the 1969 US national environmental policy act meant it was no longer ok to take unlimited water from rivers to cool reactors.
most nuclear plants built after 1969 required cooling towersâŚ
most nuclear plants built after 1969 required cooling towersâŚ
beautiful pieces of engineering they may be, but those cooling towers require quite a bit of concrete and steelâŚ
@BNW_Aus ignores this material.
@BNW_Aus ignores this material.
âŚand while the 1971 #nuclear project excludes the electrical switchyard and all modern safety systems, the analysis does include these gems:
â˘Â 138 tonnes of asbestos
â˘Â 164 tonnes of molybdenum
â˘Â 17,500 gallons of paint, and
â˘Â 4,800,000 board-feet of lumber.
â˘Â 138 tonnes of asbestos
â˘Â 164 tonnes of molybdenum
â˘Â 17,500 gallons of paint, and
â˘Â 4,800,000 board-feet of lumber.
of course youâd probably do it differently these days⌠in fact, you have to.
âŚbut wait, thereâs more. what about upstream and downstream material use?
âŚbut wait, thereâs more. what about upstream and downstream material use?
to make 1 TWh with nuclear, you only need ~3.4 tonnes of enriched UOâ. awesome eh!
âŚbut to produce that you need 2,500 â 50,000t of uranium ore. (3-4 orders of magnitude more!)
remember, @BNW_Aus is very concerned about minimising the need for mining.
https://www.world-nuclear.org/information-library/nuclear-fuel-cycle/introduction/nuclear-fuel-cycle-overview.aspx
âŚbut to produce that you need 2,500 â 50,000t of uranium ore. (3-4 orders of magnitude more!)
remember, @BNW_Aus is very concerned about minimising the need for mining.
https://www.world-nuclear.org/information-library/nuclear-fuel-cycle/introduction/nuclear-fuel-cycle-overview.aspx
âŚand that UOâ doesn't make itself!
the nuclear fuel cycle includes significant 'upstream' infrastructure â like enrichment plantsâŚ
@BNW_Aus ignores this material.
the nuclear fuel cycle includes significant 'upstream' infrastructure â like enrichment plantsâŚ
@BNW_Aus ignores this material.
âŚand there are 'downstream' material inputs.
material is needed to manage the waste. in the US the high level nuclear waste (representing only 3% of the total waste) is put into concrete and steel storage casks â 100 tons a piece.
@BNW_Aus ignores this material.
material is needed to manage the waste. in the US the high level nuclear waste (representing only 3% of the total waste) is put into concrete and steel storage casks â 100 tons a piece.
@BNW_Aus ignores this material.
those storage casks are an interim solution â the US doesnât yet know exactly what to do with them long term.
the finns
are putting their waste deep underground â into 3000 x 26 tonne copper & cast iron sarcophagi, entombed in bentonite clay.
@BNW_Aus ignores this material.
the finns

@BNW_Aus ignores this material.
. @BNW_Aus ignores the significant material required produce nuclear fuelâŚ
and the significant material required to deal with it when itâs âspentâ.
and the significant material required to deal with it when itâs âspentâ.
in their analysis, @BNW_Aus compares an imaginary *2002* solar farm â so very far from best practice â against *part* of a 49-year old nuclear power plant design that couldnât be built today.
(amazingly, or not, they didnât even know the ultimate source of their data.)
(amazingly, or not, they didnât even know the ultimate source of their data.)
if a rigorous analysis were to be undertaken for a modern #nuclear power project, including those related to upstream and downstream operations, itâs quite possible that a modern #solar farm would now âwinâ this silly race.
tbf, @BNW_Aus didnât invent this silly analysis. they copied it from @ShellenbergerMD, who similarly is sloppy with research and loose with the truth.
beyond the scope of this thread, @BNW_Aus has made similarly questionable claims about #nuclear safety, waste management and project economics that do not fare well under critical examination.
beware the zealot.
beware the zealot.
(to all the nuclear stans that are about to clog my mentions:
iâm *not* saying nuclear sucks. not at all. itâs literally awesome. solve its problems and it'll reverse itâs decline.
what i am saying is, if you want to be taken seriously, lift your game!)
iâm *not* saying nuclear sucks. not at all. itâs literally awesome. solve its problems and it'll reverse itâs decline.
what i am saying is, if you want to be taken seriously, lift your game!)