#MumbaiPowerFailure
👉I will do an objective analysis of power failure
👉Politically inclined people should stay away from the thread
👉First point: completely ruling out Chinese cyber attack.
Cyber attack is when a healthy system trips w/o any fault due to relay sabotage
👉Today power failure happened due to physical fault on lines. They were real fault
👉Out of 4 incoming lines to Kalwa substation of MSETCL one was in breakdown from 2 days, second line was in scheduled outage for replacement of worn out hardware.
👉When 2 lines were out 3rd line tripped on fault, complete load shifted on 4th. It was beyond its technical limit, it tripped
👉With its tripping 2 imp substation 400KV Kharghar n 400KV Kalwa went in dark
👉Due to it other than Thane district 360MW of Mumbai out of total of 2600 MW got affected
👉Maharashtra n Mumbai grid r separate. During normal times for reliability both work jointly
👉During grid problem in Maharashtra, Mumbai grid islands itself n work in isolation thro its
own dedicated generation (hydro + thermal)
👉Govt should investigate why Mumbai grid didn't island itself safely n whole Mumbai went in dark
👉Data of Tata power will be interesting. There statement in haste blaming MSETCL was quite a surprise
👉Still it comes under technical failure of switching unit
👉2nd point is line tripping which initiated the problem
👉The most vulnerable area is MMR region. In last couple of yrs lot of incidence of Thane, Kalyan, Dombivli n other urban areas going in dark due to congestion in
existing power network
👉MMR region has grown beyond their capacity. Capacity addition of substation n lines to cater to additional load have stuck up in land acquisition problem from yrs
👉100 cr, 200 cr substations r ready but incoming/outgoing lines
incomplete due to various factors like forest, private land, inter ministerial issues
👉On one hand capital stuck up due to incomplete, other hand due to it unit charge going up
👉Exiting network being 40 yrs old it requires regular maintenance
👉Network being overloaded, outages r rare n taken with due risk factor in mind
👉If outages n frequent replacement of worn out parts not carried out the restoration time during occurrences will span over days unlike few hours today
👉Politicians blaming each other today should sit n compile a list of how many substations, lines remaining incomplete because of different land issues
👉Isn't it collector, commissioner, secretary, minister, CS, CM responsibility to sort out land n other issues which r hampering
work
👉The only CM who sat with power sector engineer n completely turned around the situation was Narendra Modi
👉If every CM, leader understand how power sector in Gujarat overcome obstacles of land issues it will immensely hep their system
👉Lack of redundancy due to incomplete projects is the real reason for todays power failure
👉Rest is just mudslinging till the next failure happens
👉Last point: the unnecessary outrage created by politicians n others will result in fear in officers
👉Authorities will hesitate to take risk in doing work, sanctioning outage resulting in eventual deterioration of system
👉What happened in defence acquisition after bofors scam is well known, same policy paralysis after 2G scam
👉Technical issues should be solved by technical people n not by making someone spacegoat to silence hyper public
👉Leaders should encourage technical brains n offer their help in resolving issues suggested by them
👉Thanks for reading 🙏🙏