A comprehensive thread on Kaleshwaram project.

Link-1, 3 Barrages and 3 pump houses.
Lakshmi Barrage to Yelampalli reservoir.

Barrage-1, Lakshmi barrage.
Bed level-89 M
100 M Pond level.
Capacity-16 tmcft
Gates-85
Length-1632 M
@KTRTRS @RaoKavitha @trsharish @MPsantoshtrs
Pump House-1
Lakshmi (Kannepalli) Pump House.
Lift- 49 M.
17 pumps with 40 MW capacity.
@KTRTRS @RaoKavitha @trsharish @MPsantoshtrs @SmitaSabharwal
14 KM gravity canal between Kannepalli pump house and Annaram Barrage.
@KTRTRS @RaoKavitha
Saraswathi Barrage.
Gates- 66
Capacity- 11.9 tmcft.
Length-1,270 m
Height-119 M FRL
@KTRTRS @RaoKavitha
Saraswathi Pump house.
Location: Gunjapadaga.
Lift: 34 M
8 Pumps with 40 MW capacity.
Parvathi (Sundilla) Barrage.
Location- Kasipeta village.
Bed level-118 M
Pond level-130 M
Storage- 8.83 TMC
Gates - 74
Parvathi Pump House.
Location- Golivada.
Lift- 40 M
@KTRTRS @RaoKavitha @trsharish @MPsantoshtrs
Yellampalli reservoir.
Length : 1180.7m
Gates: 62.
Total capacity : 20 tmcft
You can follow @varuntrs58.
Tip: mention @twtextapp on a Twitter thread with the keyword “unroll” to get a link to it.

Latest Threads Unrolled: