A huge well done to our signalling and works delivery team who worked round the clock to remove a fire damaged location case near Yoker last week (these house electrical equipment and help control the signals in the area).
This one "Y2/5" controls the points in and out of the west end of @ScotRail’s Yoker Depot, and the signalling on the mainline between Garscadden & Yoker stations. A really key area on the busy North Clyde route.