Glad some official words coming out but there are still some questions that needs to be answered:
•The commencement date changes after every new appointed @MoCA_GoI
•The airport was to start by June’19 and the first COVID-19 case was reported in March’20
#DarbhangaAirport https://twitter.com/hardeepspuri/status/1259716342946635776
•An airbus A320 or Boeing 777 type of aircraft carries 180+ passengers but the capacity of the terminal is 150.
•Unlike other airports under UDAN, only re-carpeting of runway, terminal and apron construction took more time than building a new airport from scratch.
>>
Key take-away points:
•Just like lok sabha elections ‘19, this has been extended purposefully for the upcoming Bihar election
•The vidhan sabha election is likely to be held b/w Oct. & Nov. this year
•Also, we may see a cabinet reshuffle at the centre before state election
>>
•The ball has been passed on to @IAF_MCC
•Just like Pakyong and Jharsuguda, the flight operations will be discontinued once the election is over #DarbhangaAirport
•This should be a case study for Aviation Industry wherein a functioning airport couldn’t be made commercial
<<
You can follow @AbbyVatz.
Tip: mention @twtextapp on a Twitter thread with the keyword “unroll” to get a link to it.

Latest Threads Unrolled: