The obligatory cover story. That said, let them fight, if we stand to benefit.
1/
Public land for sanitation, sewerage treatment plants and water storage was hived off in Kariobangi, Karura, Karen, Kabete and Kahawa West. https://www.the-star.co.ke/news/2020-04-23-uhuru-in-massive-land-repossession-in-nairobi/
2/
At the Karura reservoir off Kiambu Road, 4.3 acres of land have been hived off from the original six acres allocated for water storage for Karura North and Eastern part of Nairobi.
3/
The Loresho reservoir has also lost 2.3 acres of its land grabbed by private individuals. The land was in 1996 subdivided into six parcels —Nairobi Block 90/591-596.
4/
At the Kariobangi sewerage treatment plant, 32 acres of land have been grabbed while at Ruiru some 0.4 acres have been taken up by private developers.

The Ruiru land is meant for a pumping station for Ruiru–Kabete water supply.
5/
This one I watched as thugs and churches grabbed it

At Karen ponds, off Lang'ata Road, 5.1 acres of land that was meant for the sewerage treatment works for Karen Shopping Centre has been illegally allocated to a private developer.
6/
At Kabete, 34 acres of land meant for the development of sewerage treatment works has been allocated to private individuals. Two parcels fronting Waiyaki Way are in the hands of grabbers.

Also, Karen PBT where 0.6 acres of land has been grabbed.
7/
At the Kahawa ponds, LR No. 71/7, some 9.8 acres of land meant for sewerage treatment to serve Kahawa West has been grabbed.

In Eastleigh, LR 209/7260, some 33.4 acres of land meant for a sewerage treatment plant and regional offices for staff have been hived off.
You can follow @surambaya.
Tip: mention @twtextapp on a Twitter thread with the keyword “unroll” to get a link to it.

Latest Threads Unrolled: