Now that spring has sprung we thought it would be a good opportunity to look back on the autumn/winter projects that our greenkeeping team undertook and show you how these have progressed to near completion...(1)
Now that spring has sprung we thought it would be a good opportunity to look back on the autumn/winter projects that our greenkeeping team undertook and show you how these have progressed to near completion...(1)
2nd Hole
New greenside bunker constructed on the mound to the left of the green adding a fantastic new visual aspect to the hole while also adding to the challenge of the approach shot plus some drainage improvements...(2)
New greenside bunker constructed on the mound to the left of the green adding a fantastic new visual aspect to the hole while also adding to the challenge of the approach shot plus some drainage improvements...(2)
5th Hole
The white and green tees have been extended providing a significant amount of increased teeing ground while the sleeper walls add to the aesthetics of the general area...(3)
The white and green tees have been extended providing a significant amount of increased teeing ground while the sleeper walls add to the aesthetics of the general area...(3)
10th Hole
A new bunker has been introduced to the rear of the 10th green providing a fantastic new visual aspect to the approach shot all in all improving the hole, while also assisting with drainage...(4)
A new bunker has been introduced to the rear of the 10th green providing a fantastic new visual aspect to the approach shot all in all improving the hole, while also assisting with drainage...(4)
11th Hole
The new tee box complex makes the river more visible from the white and blue tees, with a slightly different angle introduced. The surrounding wooded area has also been cleared to improve the general look of the teeing grounds...(5)
The new tee box complex makes the river more visible from the white and blue tees, with a slightly different angle introduced. The surrounding wooded area has also been cleared to improve the general look of the teeing grounds...(5)
15th Hole
This project saw the previous two bunkers to the right of the green transformed into one large bunker that now also hugs the front-right and the introduction of a new bunker to the front-left of the green...(6)
This project saw the previous two bunkers to the right of the green transformed into one large bunker that now also hugs the front-right and the introduction of a new bunker to the front-left of the green...(6)
16th Hole
A new championship tee box has been constructed adjacent to the monumental stones to the back-right of the 15th green. Trees in this area have been thinned/relocated and the stones now act as a target from the 3rd and 15th tees...(8)
A new championship tee box has been constructed adjacent to the monumental stones to the back-right of the 15th green. Trees in this area have been thinned/relocated and the stones now act as a target from the 3rd and 15th tees...(8)
Putting Green
Our biggest autumn/winter project saw the extension of the putting green to double its previous surface area. 007 Creeping Bent turf was laid prior to Christmas and we look forward to having this in play...(9)
Our biggest autumn/winter project saw the extension of the putting green to double its previous surface area. 007 Creeping Bent turf was laid prior to Christmas and we look forward to having this in play...(9)
Other Work
Reshaping of a number of fairways to make them wider for the average golfer but tighter for the longer-hitting elite player. Also reshaped some approaches for greater definition and higher levels of presentation.
Drainage work and pathway improvements continue...(11)
Reshaping of a number of fairways to make them wider for the average golfer but tighter for the longer-hitting elite player. Also reshaped some approaches for greater definition and higher levels of presentation.
Drainage work and pathway improvements continue...(11)