As industries are closed down, the half of the power demand has already gone to toss. This is impacting the power generation in country. The mega power projects are already running on half capacity.

In this case, the zero down power usage will hurt the entire system.
It could lead to the failure of national grid as well as all the power centers could be tripped.

This will take two to seven days to repair and start again. It will have major impact on power supply to essential services.

So kindly avoid this.

It's request.
You can follow @ameytirodkar.
Tip: mention @twtextapp on a Twitter thread with the keyword “unroll” to get a link to it.

Latest Threads Unrolled: