Today it’s time for some concrete foundation 🏠 👌🏻
Oh yes, look at that 😍
Today we added ground around the foundation. It’s now really clear how big it actually is 😍
Today we got the floor! 😍
Time to go up and build the walls 🧱
Moving fast! 🚀
Walls are going up, placing isolation together with my dad, and the outer stones are delivered 🎉💪🏻
First level of isolation is done, first bricks appear!
Aaaaaand we got ourselves a roof! 🙌🏻
The first parts of the roof start to appear! Starts to look like the drawings, luckily enough 😁
More stones and a second level floor! 💪🏻
That moment I’m proudly sharing a video to my dad to show that I placed insulation in one piece #bestfeelingever
It’s all in the details! 🙌🏻
Proud at my helping mom, and the kitchen foundation is there 💪🏻
Beautiful weather for some progress updates! Bricks are reaching the top while rooms get more and more visible 💪🏻
Downstairs cleaned up, can’t wait to see this in its final result 🙌🏻
Final parts of insulation ✅
We feel incredible lucky that all construction work can still go on. Today they started working on the roof! This is what work from home means to them I think 😅
The roof is coming along and the details are becoming more and more visible 💪🏻
It’s almost time for the roof tiles to be placed. Before that, first this! 🤩
It’s all looking more and more like our initial drawings. Less then 2 months until 🔑
You can follow @twannl.
Tip: mention @twtextapp on a Twitter thread with the keyword “unroll” to get a link to it.

Latest Threads Unrolled: