This is Dahisar flyover on Link Road, recently resurfaced For some reason, on the western side, the resurfacing has been done only till the point where lane markings can be seen. Beyond dat, d surface is very bad, as cn b seen. @mybmc @mybmcwardRN @RoadsOfMumbai @PotholeWarriors
My complaint is dated 6Aug. Has someone gone n checked? It is still the same after four months
No action since 6August? There is no work done here, so far. Has someone even gone & inspected the site? @mybmcWardRN @mybmc @MCGM_BMC
Please attend @mybmcBridges
Unattended complaint of Aug 2019! @mybmc @mybmcroads @mybmcbridges @mybmcwa4dRN I don't know which Dept will attend to this. Today, the situation is much worse, as the potholes hv developed into craters. Why this negligence.? Absolutely shameful. @melvin1003
Please check this thread. @mybmc .it's a matter of great surprise that this complaint has not been attended to SINCE AUGUST 2019. This is a busy road connecting Western suburbs to the WEH. No one has bothered to attend to this. It is, now, much worse that earlier.
You can follow @mrsinghCricUmp.
Tip: mention @twtextapp on a Twitter thread with the keyword “unroll” to get a link to it.

Latest Threads Unrolled: